Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 16 results ...

Babaei, M, Rashidi-baqhi, A and Rashidi, M (2022) Estimating Project Cost under Uncertainty Using Universal Generating Function Method. Journal of Construction Engineering and Management, 148(02).

Bai, S, Li, M, Lu, Q, Tian, H and Qin, L (2022) Global Time Optimization Method for Dredging Construction Cycles of Trailing Suction Hopper Dredger Based on Grey System Model. Journal of Construction Engineering and Management, 148(02).

  • Type: Journal Article
  • Keywords: Trailing suction hopper dredger (TSHD); Grey system model; Loaded earth curve; Overflow loss; Global time optimization;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0002239
  • Abstract:
    The efficient operation of trailing suction hopper dredgers can reduce equipment operation time and energy consumption, accelerate overall construction, reduce workload and material resource usage, and lower construction costs. Based on an in-depth analysis of the dredging construction optimization problem, the overflow loss prediction and a loading cycle optimization method based on the loaded earth curve are proposed in this study. The loading cycle optimization method is divided into three stages. In the first stage, statistical learning and machine learning methods are used to predict and analyze the loaded earth data by describing the time scale of the loaded earth data, and the grey system prediction model was selected for the subsequent developments. In the second stage, by analyzing the loaded earth curve prediction model, the concept of overflow loss rate and its predictive calculation method is proposed. In the third stage, combined with the loaded earth curve prediction model, a global time geometric coordinate optimization model of the loading cycle is proposed to avoid the power and time waste caused by excessive overflow loss. A channel dredging project in Tianjin Port was taken as an application example to verify the applicability of the proposed optimization method and optimize the construction work efficiency.

Che Ibrahim, C K I, Belayutham, S, Mohammad, M Z and Ismail, S (2022) Development of a Conceptual Designer’s Knowledge, Skills, and Experience Index for Prevention through Design Practice in Construction. Journal of Construction Engineering and Management, 148(02).

Ghafoori, M and Abdallah, M (2022) Simulation-Based Optimization Model to Minimize Equivalent Annual Cost of Existing Buildings. Journal of Construction Engineering and Management, 148(02).

Jia, F, Xiang, P and Chen, D (2022) Prioritizing the Operation and Maintenance Complexity of Mega Transportation Projects Based on Systems Thinking. Journal of Construction Engineering and Management, 148(02).

Lerche, J, Enevoldsen, P and Seppänen, O (2022) Application of Takt and Kanban to Modular Wind Turbine Construction. Journal of Construction Engineering and Management, 148(02).

Li, P, Wang, Q, Guo, Z, Mei, T, Li, Q, Qiao, S and Zuo, W (2022) Identifying Falling-from-Height Hazards in Building Information Models: A Voxelization-Based Method. Journal of Construction Engineering and Management, 148(02).

Li, X, Lu, W, Xue, F, Wu, L, Zhao, R, Lou, J and Xu, J (2022) Blockchain-Enabled IoT-BIM Platform for Supply Chain Management in Modular Construction. Journal of Construction Engineering and Management, 148(02).

Liu, K, Su, Y, Pollack, J, Liang, H and Zhang, S (2022) Explaining the Formation Mechanism of Intrateam Knowledge Exchange Network in Offsite Construction Projects: A Social Cognitive Perspective. Journal of Construction Engineering and Management, 148(02).

Park, J and Cho, Y K (2022) Point Cloud Information Modeling: Deep Learning–Based Automated Information Modeling Framework for Point Cloud Data. Journal of Construction Engineering and Management, 148(02).

Radzi, A R, Rahman, R A, Doh, S I and Esa, M (2022) Construction Readiness for Highway Projects: Key Decision Criteria. Journal of Construction Engineering and Management, 148(02).

Sanboskani, H and Srour, I (2022) Using Advanced Statistical Methods to Identify the Drivers of Knowledge Sharing Intention among Construction Workers. Journal of Construction Engineering and Management, 148(02).

Shehadeh, A, Alshboul, O and Hamedat, O (2022) Risk Assessment Model for Optimal Gain–Pain Share Ratio in Target Cost Contract for Construction Projects. Journal of Construction Engineering and Management, 148(02).

Yoon, J H and Pishdad-Bozorgi, P (2022) State-of-the-Art Review of Blockchain-Enabled Construction Supply Chain. Journal of Construction Engineering and Management, 148(02).

Zhang, C, Chen, K, Yang, J, Fu, J, Wang, S and Xie, Y (2022) Reuse of Discharged Soil from Slurry Shield Tunnel Construction as Synchronous Grouting Material. Journal of Construction Engineering and Management, 148(02).

Zhang, Y, Yuan, J, Zhao, J, Cheng, L and Li, Q (2022) Hybrid Dynamic Pricing Model for Transport PPP Projects during the Residual Concession Period. Journal of Construction Engineering and Management, 148(02).